Atrisco

New Mexico

MW-DC Total

364

Battery (MWh)

1200

Commercial Operation

2024

Operationa

The Atrisco Solar Project began delivering clean energy to the grid on October 24, 2024.

Solar Power and Battery Storage

This project includes solar power generating photovoltaic (PV) arrays with a capacity to produce 364 MWdc. The PV site is companioned with a battery energy storage solution (BESS) that will store 1.2 GWh of energy. This dual-use facility not only generates clean energy, but stores excess power that can be used when the sun isn't shining - enhancing reliability and increasing the availability of clean power to the grid.