The Atrisco Solar Project began delivering clean energy to the grid on October 24, 2024.
This project includes solar power generating photovoltaic (PV) arrays with a capacity to produce 364 MWdc. The PV site is companioned with a battery energy storage solution (BESS) that will store 1.2 GWh of energy. This dual-use facility not only generates clean energy, but stores excess power that can be used when the sun isn't shining - enhancing reliability and increasing the availability of clean power to the grid.