The Atrisco Solar Project is currently under construction. It is anticipated to reach commercial operation in the third quarter of 2024.
This project includes solar power generating photovoltaic (PV) arrays with a capacity to produce 364 MWdc. The PV site is companioned with a battery energy storage solution (BESS) that will store 1.2 GWh of energy. This dual-use facility will not only generate clean energy, but store excess power that can be used when the sun isn't shining - enhancing reliability and increasing the availability of clean power to the grid.